Progress Report April 27, 2007 – May 3, 2007 Team: Interpenetrating networks for delivery systems Team Members: Ashley Huth- Team Leader Claire Flanagan- Communicator Jon Sass- BSAC Adam Rieves- BWIG Client: Professor John Kao UW School of Pharmacy & Department of Biomedical Engineering 7123 Rennebohm Hall Phone: 263-2998 Email: [email protected] Problem Statement: Interpenetrating networks are a type of biomaterials that polymerize in situ and have been used in drug delivery, wound healing, and tissue engineering applications. This design project involves the development of novel delivery mechanisms that should be clinically easy to use with improved storage life. Summary of Accomplishments • Performed surface area tests with atomizer tip. • Performed pressure tests with atomizer tip using Professor Chesler’s pressure gauge and Lab View software. • Completed second prototype. • Constructed an effective seal for upper compartment in our prototype. • Finished poster. • Made more water soluble gelatin, at varying degrees of percent composition. • Made cost projection table. • Finished solid works models. This Week’s Goals • Give poster presentation. • Finish final design paper. ExpensesProduct # Supplier PriceACS Reagent Grade 500mL S70090 Fischer Scientific $5.94Isopropanol 500mL AC42383-5000 Fischer Scientific $15.90One-way drinking strawsST1001 Allegro-Medical $24.955 atomizer connetors for syringes MAD300 Wolfe Tory Medical $0.00$46.79Total Cost ActivitiesTeam Member Activity Time Running TotalClaireTeam meeting Sunday, team meeting Monday, work in shop and lab, work on poster, work on gelatin15 hours 76.5 hoursAshleyTeam meeting Sunday, team meeting Wednseday, team meeting Monday, work in shop and lab, work on poster, progress report10 hours 69 hoursJonTeam meeting Sunday, team meeting Wednseday, team meeting Wednseday, work in shop and lab, work on solid works design, BSAC meeting10 hours 68 hoursAdamTeam meeting Sunday, team meeting Wednseday, team meeting Monday work in shop and lab, updated website, work on gelatin15 hours 75.5 hours50 hours 289 hoursTeam Total Project Timeline2 9 16 23 2 9 16 23 30 6 13 20 27 4 11 18DesignDesign BrainstormingO O O O OPreliminary DesignO O OFriday Team MeetingO O O O O O O O O O O O OResearchO O O O O O O O O ODeliverablesProgress Report▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲PDSO O OMid Semester PaperO OMid Semester PresentationO O OEnd Semester PresentationOEnd Semester PaperMeetingsClientO O OAdvisorO O O O O O O O O O O OOtherWebsite X X X X X X X X X X X XBSAC♦ ♦ ♦ ♦ ♦ ♦ ♦AllAdamAshleyClaireJon■♦X▲Done GoalOMayTaskFebruary March
View Full Document