Life Cycle Plan (LCP)Version HistoryTable of ContentsTable of TablesTable of FiguresA.1.1 Purpose of the LCPA.1.2 Status of the LCPA.1.3 AssumptionsA.1.4 Overall StrategyA.1.5 Project Deliverables.1.5.1 Exploration Phase.1.5.2 Valuation Phase.1.5.3 Foundations Phase.1.5.4 Development PhaseA.1.6 Project-specific stakeholder’s responsibilitiesA.1.7 Responsibilities by PhaseA.1.8 SkillsA.1.9 Monitoring and Control.1.9.1 Closed Loop Feedback Control.1.9.2 ReviewsA.1.10 Methods, Tools and FacilitiesResult of COTIPMOLife Cycle Plan (LCP) Improving Thai CDCEstablishing a New Client/Donor/PartnerCommunications & Project Tracking ToolTeam #: 01Team Members & RolesName Primary/Secondary RoleBrandon Foster IIV & V/Quality Focal PointDing Li Life Cycle Planner/Software ArchitectYi Li Feasibility Analyst/Requirements EngineerIno Mantaring Requirements Engineer/PrototyperVishal Punjabi Operational Concept Engineer/PrototyperKatelyn Swift-Spong Manager/Operational Concept EngineerCharles Muckenthaler IIV&V 10/24/2011Life Cycle Plan (LCP) Version .:3.0Version HistoryDate Author Version Changes made Rationale09/28/2011 Ding Li 1.0Add development members' skill formTo identify team members' skills 10/07/2011 Ding Li 1.1Add assumptions and status of LCP, modified inconsistencies.To identify purpose of LCP, explicit assumptions about clients,response to VCP evaluation10/10/2011 Ding Li 2.0Assumptions updated, skills of development team updatedDocument for FCP. To identify new skills learned by development team10/14/2011 Ding Li 2.1Strategy, approaches and resources are define.For Draft FCP10/24/2011 Ding Li 3.0Content updated, bugs fixed, new team member addedFor DCP11/14/2011 DL 3.1Bugs fixed To fixed some reported bugsError: Reference source not found ii Version Date:10/24/2011Life Cycle Plan (LCP) Version .: 3.0Table of ContentsLife Cycle Plan (LCP)....................................................................................................................................................iVersion History.............................................................................................................................................................iiTable of Contents.........................................................................................................................................................iiiTable of Tables..............................................................................................................................................................ivTable of Figures.............................................................................................................................................................v1. Introduction.................................................................................................................................................11.1 Purpose of the LCP.....................................................................................................................................11.2 Status of the LCP.........................................................................................................................................11.3 Assumptions.................................................................................................................................................12. Milestones and Products.............................................................................................................................22.1 Overall Strategy...........................................................................................................................................22.2 Project Deliverables....................................................................................................................................23. Responsibilities............................................................................................................................................53.1 Project-specific stakeholder’s responsibilities..........................................................................................53.2 Responsibilities by Phase............................................................................................................................53.3 Skills..............................................................................................................................................................64. Approach......................................................................................................................................................74.1 Monitoring and Control..............................................................................................................................74.2 Methods, Tools and Facilities.....................................................................................................................75. Resources......................................................................................................................................................8 iii Version Date:10/24/2011Life Cycle Plan (LCP) Version .:3.0Table of TablesTable 1 : Deliverable Artifacts in Exploration Phase...................................................................................................2iv Version Date:10/24/2011Life Cycle Plan (LCP) Version .:3.0Table of FiguresNo table of figures entries found.v Version Date:10/24/2011Life Cycle Plan (LCP) Version.: 3.0IntroductionA.1.1 Purpose of the LCP This document, the Life Cycle Plan (LCP), will be used as the guideline for the entire project. It will identify the different types of artifacts each team member will deliver, describe the milestones shared by all stakeholders, and also identify the skills and responsibilities of each team member, as applicable to this project. With such a purpose, the LCP looks to ensure the entire project will meet all milestones, and deliver a system that is expected by the clients, development team, and USC staff. A.1.2 Status of the LCP The status of the LCP is currently at the Foundation Commitment Package versionnumber 3.0. In this version, we fixed bugs in last version. COTIPMO estimation updatedA.1.3 Assumptions- The duration of the project is 12 weeks. - Product is supposed to be delivered to client in the Fall semester of 2011.- The development-team members will not change during the 2011 Fall semester.- Main functions of the newly developed
View Full Document