Wabash Valley Rail Trail Consulting The Covered Bridge Gateway Trail Company LOGO Project Presentation Wabash Valley Rail Trail Consulting David Pirnia Project Manager Dave Honan Project Editor Travis McKittrick Client Liaison Philip Griffith Project Engineer Andrew Twarek Project Engineer Company LOGO Company LOGO Overview 1 1 Project Project Description Description 2 2 Design Design Process Process 3 3 Final Final Design Design 3 Company LOGO Project Description 17 miles abandoned railroad right of way Parke and Vigo Counties Rails to Trails project Shared use path 4 Company LOGO Project Location Rockville Catlin Rosedale North Terre Haute Terre Haute N 5 Company LOGO Client Description West Central Indiana Economic Development District Inc To stimulate economic development through multi county efforts Clay Parke Putnam Sullivan Vermillion Vigo 6 Company LOGO Client Requests Document property ownership Provide trailhead site plans Design two bridges Phased construction plan Cost estimate PRR Depot Bridgeton Road 1 Sunderland Branch Catlin 3 4 Rosedale 2 Markle Mill Park N 7 Company LOGO Overview 2 2 Design Design Process Process Current CurrentConditions Conditions Property Property Research Research Preliminary Preliminary Design Design Design Design Options Options Final FinalDesign Design 8 Company Current Conditions LOGO Rockville Conditions and Property CurrentConditions Conditions Current Property Property Research Research Preliminary Preliminary Design Design Design Design Options Options CR 400 S FinalDesign Design Final Terre Haute 9 Company Property Ownership LOGO Conditions and Property CurrentConditions Conditions Current Property Property Research Research Preliminary Preliminary Design Design Design Design Options Options FinalDesign Design Final Original Penn Central rightof way Compiled county tax maps along route Now held by US Railroad Vest and private landowners each about Major obstacle in project construction 400 005 10 Company Site Surveys LOGO Conditions and Property CurrentConditions Conditions Current Property Property Research Research Preliminary Preliminary Design Design Topographic maps for bridge design Design Design Options Options FinalDesign Design Final Bridgeton Road Sunderland Branch Crossing Site mapping at trailheads Pennsylvania Railroad Depot Markle Mill Park PRR Depot Bridgeton Road Sunderland Branch Markle Mill Park N 11 Company LOGO Bridgeton Road Site Survey d oa ilr Ra W R N oad R n o t e Bridg Bridge Abutments 12 Company Hydrologic Study LOGO Preliminary Design CurrentConditions Conditions Current Property Property Research Research 85 Point US 41 Preliminary Preliminary Design Design Design Design Options Options FinalDesign Design Final Secondary Channel Main Channel Drainage Area DA 2 94 mi2 Slope SL Dam 42 4 ft mi 1600 ft3 s Q100 91 2 DA0 811 SL0 529 10 Point Estimated Peak Flow Bridge Site 1600 ft3 s N 13 Company Hydraulic Study LOGO Preliminary Design CurrentConditions Conditions Current Property Property Research Research Preliminary Preliminary Design Design Design Design Options Options Top of Bent Elevation 577 1 FinalDesign Design Final Top of Barrel Elevation 573 5 Road Elevation 575 0 High Water Elevation 571 7 Typical Water Elevation 567 0 14 Company Design Options LOGO Design Options CurrentConditions Conditions Current Property Property Research Research Preliminary Preliminary Design Design Sunderland Branch Bridge Design Options Design Design Options Options FinalDesign Design Final Timber Trestle Steel Through Truss Precast Concrete Box Beam Steel Girder Existing Through Truss 15 Company LOGO Design Option Evaluation 16 Company LOGO Overview 3 3 Final Final Design Design Current Conditions Property Research Preliminary Design Design Options Final Design 17 Company Final Design LOGO Final Design CurrentConditions Conditions Current Property Property Research Research Preliminary Preliminary Design Design Design Design Options Options Trail Design Overall Trail Route FinalDesign Design Final Site Development of Trailheads Structural Design of Bridges 18 Company LOGO Trail Design Trail Design Use and Accessibility Historical significance Typical cross sections Intersections 1 Surface HMA on 2 Intermediate HMA on 4 Min Compacted Aggregate Base 19 Company LOGO Trail Design Intersection Trail Design 20 Company LOGO Overall Trail Route on Aerial Photos 7m ile s Overall Trail Route 21 Company LOGO Overall Trail Route 22 Company LOGO Bridge Designs Structural Design of Bridges Design main structural components of two bridges Bridgeton Road Sunderland Branch N 23 Company LOGO Timber Covered Bridge Structural Design of Bridges 24 Company LOGO Timber Covered Bridge Structural Design of Bridges 25 Company LOGO Sunderland Branch Trestle Structural Design of Bridges 10 10 26 Company LOGO Site Development of Trailheads PRR Depot Site Development of Trailheads Trailhead Amenities Restroom Maintenance Parking Markle Mill Park N 27 Company LOGO Rockville Trailhead N 28 Company LOGO Conceptual Cost Trail Construction 2 954 000 Phase 1 839 000 Phase 2 473 000 Phase 3 839 000 Phase 4 803 000 Bridgeton Rd Sunderland Br 74 000 Trailhead Construction 240 000 Total 18 5 miles 3 270 000 Cost Per Mile 177 000 29 Company LOGO Summary 1 1 Project Project Description Description 2 2 Design Design Process Process 3 3 Final Final Design Design 30 Company LOGO Questions 31 Wabash Valley Rail Trail Consulting The Covered Bridge Gateway Trail Company LOGO Project Presentation
View Full Document
Unlocking...