DOC PREVIEW
MSU ECE 480 - progressReport 2

This preview shows page 1 out of 2 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 2 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 2 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

Team 1 Progress Report #211/20/09Introduction A great deal of progress has been made in the past few weeks. Pulse width modulation has been put into operation on the microcontroller, the optimal Peltier device has been found, and the current out of the microcontroller has been boosted via transition stage. The few remaining issues in hardware and software will be outlined in the subsequent sections. Hardware The components for automatic control have been received and tested. Each are working as expected. The only remaining step in this area is to implement the components into the current system and retest. The other main hardware issue is that the manual controls have not yet been set up. This is a minor adjustment and will be remedied shortly. Other considerations include a sensor for the body temperature and another relay for the pump. These are not critical to the design specifications and will be dealt with time allowing. Software Pulse width modulation has been implemented on the microcontroller. The duty cycle is still under consideration. An initial segment has been added to the very beginningof the sequence to bring the water temperature up or down before starting into the pulseTeam 1 Progress Report #211/20/09width modulation, the timing of this segment can also be changed at will. The remaining software issues are programming the LCD and user interface. BudgetAll components for the project have been ordered with $145.12 left in the budget. Conclusion In conclusion, we are on schedule to complete the system with automatic heating and cooling within the next week. Manual controls will be added shortly as well as a display and user interface. This will still leave ample time for testing of the system and ofthe duty


View Full Document

MSU ECE 480 - progressReport 2

Documents in this Course
ganttv1

ganttv1

6 pages

sd97

sd97

17 pages

ap_EO

ap_EO

14 pages

Load more
Download progressReport 2
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view progressReport 2 and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view progressReport 2 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?