1- Concept- Customer & Technology BasisProject Phases- Affirmed Goals/Needs- Scope Definition - Key MetricsDeliverablesAssess Customer Wants/Metrics/SpecificationsDesignProve- Project Plan- Concept Design- Engineering Basis- Plan update- Proof of Concept Prototype- Path Forward Plan0Confirmy- Technology Req’ts.Propose- Create/Design Concept; Analyze; Test- Benchmark TechnologyDesignConceptProveConceptDevelopment0Confirm Requirements1ProposeConcept23UDesign and/or Dym and LittleFeedback - ContentShow logic & assumptionsUse valid target customersgDerive Wants = “should” ; constraints = “must”Derive lessons learned from benchmarkingDerive Metrics = ways to measure “wants”Derive Target Values = Engr RequirementsSummarize why wants, metrics, target values chosenIdentify, design, analyze critical subsystemsGenerate ConceptsExplain tradeoffs among serious alternativesDerive “Decisions”, Select “Best” ConceptShow figure of selected concept in body of report!Feedback - FormAlways deliver your best effort Context –what is this report for? Use Graphics! Make Figure title say point to be made. Show jar in place to have lid removed Embed important Figs, use Fig. #’s, AND TALK TO FIGURES Make use of Writing Center Always spell-check, proof-read, make user-friendly Write in 3rdperson. Avoid “ I, we, my, …,etc” Always read out loud!2Feedback - OtherLogical order of tasks?V lidit f C t /W t /M t i ?Validity of Customers/Wants/Metrics?Benchmarking Photos, Data, Lessons Learned? Patents, References (use Author-Date)?Select Best Concept by Metrics/Target ValuesDon’t make reader search for selected concept! Make it the center piece of your proposal. Talk about it.Check sensitivity of decision to inputs?Feedback-Peer EvaluationsSubmit peer evaluations on time!F il t d lt i ttiFailure to do so results in you getting a 55, and your team mates getting an 85, in place of what you may have intendedJustify any evaluation other than an 85Extremely high or low evaluations willExtremely high or low evaluations will be adjusted by instructor!No peer evaluation will be accepted late- Concept- Customer & Technology BasisProject Phases- Affirmed Goals/Needs- Scope Definition - Key MetricsDeliverablesAssess Customer Wants/Metrics/SpecificationsDesignProve- Project Plan- Concept Design- Engineering Basis- Plan update- Proof of Concept Prototype- Path Forward Plan0Confirmy- Technology Req’ts.ProposePh2 Draft on 5/7- Create/Design Concept; Analyze; Test- Benchmark TechnologyDesignConceptProveConceptDevelopment0Confirm Requirements1ProposeConcept23Ph2 Final on 5/21Phase 2 – Big PictureIntro – Summarize ProjectDetail Design Design Freeze by Ph2 Draft Submittal Engr Drawings & Assembly Drawings with Bill of Materials and NotesAnalyses (Must include FEA of criticalAnalyses (Must include FEA of critical component) Risk Reduction Plan Forward3Phase 2 - IntroBackgroundCt / tdtdCustomers/wants –updatedBenchmarking Lessons, metrics, range of wild ideasMetrics & Target Values – How?, Why?SfCtSltiSummary of Concept SelectionPhase 2 – Detailed DesignFlow Chart of Decisions?Subsystems & InteractionsSubsystems & InteractionsCritical Metrics, Target Values Include deflection, strength, fatigue, vibration…List Assumptions!Easy/Tough Choices & CompromisesSafetyFactor/Margin SummarySafety Factor/Margin SummaryPhase 2 – Audience IssuesCoherence is #1 taskGraphics (shrink sizes)Graphics (shrink sizes) Re-do sketches Intersperse figures in body of report and talk to figures!Schedule – Roll up earlier sub-tasksDiN d Bill f M t i lDrawings –Need Bill of Materials(Backup Slides – Key to Good Q/A)4UDesign and/or Dym and
View Full Document