DOC PREVIEW
MIT 16 01 - Systems Problem 9

This preview shows page 1 out of 3 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 3 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 3 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

16.030-16.040 Unified Engineering Department of Aeronautics & Astronautics Massachusetts Institute of Technology Spring 2004 Systems Problem 9 Build I & II Propulsion, Payload, Operations Validation and System Acceptance Handed out: Thursday, 15 April 2004 Answers due: Build I Report: Thursday, 22 April 2004, 5:00 p.m. System Acceptance Presentation: Friday, 23 April 2004 Build II Report: Thursday 29 April 2004, 5:00 p.m. Objectives At the end of this systems problem you should be able to: • Implement and operate a system that you have designed and conceived completing the CDIO process • Manage, record and report against planned manufacturing and testing plans and procedures. Discussion Time to build! You have now completed the conceptualization and design phases of your competition system. Now it is time to implement your designs. You will have two (2) weeks to build and test your aircraft and competition procedures. You will report weekly on your progress. And you will participate in a validation and system acceptance review. Assignment This is a group assignment. Build and test your aircraft and competition system. A record of your building and testing process and progress is required. Two (2) weekly reports are due for this assignment. The first is due 5 p.m. Thursday 22 April 2004 and the second is due 5 p.m. Thursday 29 April 2004. A pro forma for the weekly report contents will be provided in Microsoft World format. Your weekly reports must be submitted in Microsoft Word format. A validation and system acceptance review is also required. A pro forma for the system acceptance review will be provided in Microsoft PowerPoint format. Validation and system acceptance presentations will take place on Friday 23 April 2004. Sign up times for the validation and system acceptance review will be posted. Deliverables Build Reports: A brief outline of the build report pro forma follows below: 1 of 3I. Build: goals, manufacturing procedures, schedule, time estimates and actuals, status II. Test: goals, procedures, schedule, time estimates and actuals, status III. Training: goals, procedures, schedule, time estimates and actuals, status IV. System performance against predicted goals. Appendix A. Build Log B. Test Log Validation and System Acceptance Review: Three or four slides are required for the system acceptance review. You are expected to present the predicted performance of your system, the configuration of your system (product, people, procedures). You must present a three view of your final aircraft design. You must document and justify any production changes that differ from your initial design. Original: CPColeman, Spring 2001 Modified: GBarter, CEJohnson, PWYoung, CPColeman, Spring 2002 CPColeman, OdeWeck, PWYoung, JPixley, Spring 2003 CPColeman, Spring 2004 2 of 3Systems Problem 9 Build I & II Propulsion, Payload, Operations Validation and System Acceptance Handed out: Thursday, 15 April 2004 Answers due: Build I Report: Thursday, 22 April 2004, 5:00 p.m. System Acceptance Presentation: Friday, 23 April 2003 Build II Report: Thursday 29 April 2003, 5:00 p.m. Group Number Group Name Name Time Spent 3 of


View Full Document

MIT 16 01 - Systems Problem 9

Documents in this Course
Fluids

Fluids

3 pages

Fluids

Fluids

4 pages

Fluids

Fluids

4 pages

Fluids

Fluids

5 pages

Load more
Download Systems Problem 9
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Systems Problem 9 and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Systems Problem 9 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?