DOC PREVIEW
UW-Madison BME 400 - Project - A Child Passenger Safety Seat (Child Seat)

This preview shows page 1 out of 3 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 3 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 3 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

Professor Mitch Tyler BME 400 1Project: A Child Passenger Safety Seat (Child Seat) Team Members: 1. Ross Gerber—Team Leader Email: [email protected] 2. Aman Ghotra—Communication Email: [email protected] 3. Erik Bieging—BWIG Email: [email protected] 4. Karim Mahamud—BSAC Email: [email protected] 5. Miguel Benson—BSAC Email: [email protected] Advisor: Mitch Tyler, PhD Department of Biomedical Phone: (608) 262-5112 Email: [email protected] Client: Tom Brazelton, MD Department of Pediatrics Phone: (608) 263-8901 Email: [email protected] Date of Progress Report: 11/17/05 Problem Statement: The goal of our project is to develop or improve the current method of transporting a child or infant in an ambulance on a stretcher. The method or device developed must be better than the current methods. A new method or device must be collapsible, and compatible with current ambulatory stretchers. Most importantly, the final device must meet all federal safety child seat guidelines. Restatement of Team Goals from Last Week: This week we are going to finish the large components of the design and hopefully begin tweaking different features. If all goes well, we may be able to add fabric and padding for aesthetics. Summary of Accomplishments This Week: This week we began putting our prototype together. We completely finished the sliding shoulder strap mechanism, the sliding back rest, and the recline lock mechanism. For the most part, theProfessor Mitch Tyler BME 400 2upper section of the seat is finished. We also contacted Terry Frick to get a stretcher for the final presentation and for testing. Individual Goals for this week: 1. Ross: Construction 2. Aman: Locate fabric and padding 3. Erik: Finish up base. 4. Karim: Finish up base. 5. Miguel: Determine how to connect straps to mechanism Statement of Team Goals for this week: This week we will completely finish the leg rest and attach the base to the back rest. We will also try to cover the unit with fabric and padding. Tentative Project Schedule: 09/02/05: Formed teams and assigned roles 09/08/05: Met our client 09/16/05: Develop PDS; Brainstorm possible designs 09/23/05: Start writing mid-semester reports 10/01/05: Evaluate Ideas and work on power point; Peer review mid-semester reports 10/08/05: Mid-Semester Presentation; Design notebooks, PDS, mid-semester reports due 10/15/05: Choose a final design 10/15/05 – 11/26/05: Work on the final design; Testing; Modifications 11/26/05: Work on the final power point, paper and PDS 12/15/05: Poster Presentation; Final paper, PDS, evaluations and design notebooks due Difficulties: No stretchers are available at this time. Activities/Accomplishments: Names Activities Time (hrs) Running Total (hrs) Ross Construction 8 51 Aman Construction 4 35 Erik Construction 6 28 Karim Construction 6 28 Miguel Construction 5 29 Total 29 171Professor Mitch Tyler BME 400 3 Weekly Goals for Fall 2005: Week 1 (9/2/05-9/4/05) o Form Teams, Assign Roles, Make an appointment with client Week 2 (9/5/05-9/11/05) o Meet Client, Do background research, Set up team website, Begin working on PDS, Week 3 (9/12/05-9/18/05) o Finish rough draft of PDS, Meet client for demonstrations, Discuss PDS with advisor, Finish up any remaining research, Email researchers Levine and Bull Week 4 (9/19/05-9/25/05) o Discuss PDS with client, Begin brainstorming design ideas, Collect estimates for designs brainstormed (i.e. cost, dimensions, safety tests to be used, pros and cons) Week 5 (9/26/05-10/2/05) o Finish brainstorming, Finalize a Design as a group, Show designs to Client, Get consent from client and decide on one Design, Order pertinent supplies (i.e. materials), Research materials and companies if needed, Look for various prototype tests and facilities Week 6 (10/3/05-10/9/05) o Begin constructing prototype, Prepare for Mid-semester presentations and begin writing the Mid-semester reports Week 7 (10/10/05-10/16/05) o Mid-semester Presentation, Invite Client, Keep building prototype Week 8 (10/17/05-10/24/05) o Work on the prototype Week 9 (10/25/05-10/30/05) o Finish the prototype, Test prototype, gather data, make observations Week 10 (10/31/05-11/6/05) o Modify prototype based on testing Week 11 (11/7/05-11/13/05) o Finish Building the prototype Week 12 (11/14/05-11/20/05) o Collect data and retest the prototype Week 13 (11/21/05-11/27/05) o Make last minute adjustments to the prototype, Begin preparing for poster presentation and Final Paper Week 14 (11/28/05-12/4/05) o Final Presentation, Invite Client for poster session Week 15 (12/5/05-12/10/05) o Turn in notebooks, final report and evaluation form, Give the Prototype to client, Meet


View Full Document

UW-Madison BME 400 - Project - A Child Passenger Safety Seat (Child Seat)

Documents in this Course
Load more
Download Project - A Child Passenger Safety Seat (Child Seat)
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Project - A Child Passenger Safety Seat (Child Seat) and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Project - A Child Passenger Safety Seat (Child Seat) 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?