DOC PREVIEW
Berkeley CIVENG 165 - The Illinois Street Intermodal Bridge

This preview shows page 1-2-3-4-5 out of 14 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 14 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 14 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 14 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 14 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 14 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 14 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

By: Lauren HueyNathan LangdonMaggie OrtizThe Illinois Street Intermodal BridgeThe Illinois Street Intermodal BridgeOverview / HistoryOverview / History• Start date: October 2004• Estimated Finish Date: September 2006• 525-feet long, 40-feet wide• Crosses Islais Creek in San Francisco• Will serve rail road access and traffic flows• Single leaf bascule non-counterweighted lift assembly3 Site Visits3 Site VisitsFebruary 3, 2006Formwork placementFebruary 22, 2006Concrete placementApril 10, 2006Curing completed• 3 different mixes: - Bridge deck -Piles-Pile caps• Main concern: Corrosion ControlConcrete Mix DesignConcrete Mix DesignConcrete Mix Design Concrete Mix Design ––Bridge Bridge DeckDeck• Type II Cement• Design Strength: 4,060 psi• w/c = 0.4• Slump = 6 in.• Air content: 1.5%• Pozzolan (metakaolin) content: 10%• Coarse Aggregate: 44% by weight (max size = 1 in.)• Fine aggregate:33 % by weight (natural sand)• Admixtures:- water reducer- high range water reducerConcrete Mix Design Concrete Mix Design ––Piles & Pile CapsPiles & Pile CapsType II CementDesign Strength: 4,000 psiFly ash content: 25% (by weight)Air content: 1.5%Coarse aggregate: #57Fine aggregate: Natural sandAdmixtures:- water reducer- accelerator (only in pile caps!)Concrete PlacementConcrete PlacementBullfloaterHand finisherQuality ControlScreeders & ShovelersVibratorsProject ManagerConcrete Pump Boom OperatorPump Truck TechnicianFormwork CarpentersConcrete NozzlemenReinforcementReinforcement• Epoxy-coated rebar• High quality control for corrosion controlPouring Pouring • Pour date: February 22• 80 yd3was poured over 4 hoursEquipmentEquipmentFinishingFinishing• Smooth finish over sidewalk• Rough finish for asphalt coverCuringCuring• Chemical curing using aqua resin• Wet curing using “Burlene”• Both curing techniques used to ensure full curingQuality ControlQuality


View Full Document

Berkeley CIVENG 165 - The Illinois Street Intermodal Bridge

Download The Illinois Street Intermodal Bridge
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view The Illinois Street Intermodal Bridge and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view The Illinois Street Intermodal Bridge 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?