DOC PREVIEW
Berkeley CIVENG 165 - Group 7 presentation

This preview shows page 1-2-21-22 out of 22 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 22 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 22 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 22 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 22 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 22 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

VMVMwarewarePARKING GARAGEPARKING GARAGE••What: What: VMware new research facilitiesVMware new research facilities••Who:Who:DPR construction, DPR construction, ••Where:Where:Palo Alto, CaliforniaPalo Alto, California••Duration:Duration:190 days. 190 days. ••Estimated finish date: Estimated finish date: June 4, 2007 June 4, 2007 ••FocusFocus: two: two--story parking garagestory parking garageVolume(ft^3)SSD(lb/yd^3)CEMENT 3.35658SAND 8.41381AGGREGATE 10.31800AIR 0.410WATER 4.55284TOTAL 274123BATCHINGBATCHING••ReadyReady--mix mix concrete by concrete by Central Concrete Central Concrete Supply Supply ••Hot mix : 7 sack of Hot mix : 7 sack of cement instead of cement instead of 4 sacks4 sacks••First pour at 4 a.m. First pour at 4 a.m. ••Transport from Redwood City to Palo Transport from Redwood City to Palo Alto (10min driving)Alto (10min driving)FORMWORKFORMWORK••Fast setting timeFast setting time••Backpack gas vibratorsBackpack gas vibrators••Constructability ConstructabilityColumn RebarColumn RebarBeamBeamRebarRebar•Time of pourTime of pour••SealantSealant••Low w/c ratioLow w/c ratio••Adequate level of strength from testsAdequate level of strength from testsÎÎ3000 psi3000 psi••Tensioning of cablesTensioning of cables••Green ConstructionGreen Construction••TreesTrees••NoiseNoise••TrafficTraffic••Rain waterRain waterSpecial Thanks To DPRTHE


View Full Document

Berkeley CIVENG 165 - Group 7 presentation

Download Group 7 presentation
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Group 7 presentation and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Group 7 presentation 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?