DOC PREVIEW
Berkeley CIVENG 165 - Group project

This preview shows page 1-2 out of 7 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 7 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 7 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 7 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

Group ProjectCE 165Important component of the course (necessary but not sufficient for a good grade!!) Mission: Select an on-goingconstruction project dealing with reinforced concrete. Group Size: 4 students Visit at least twice the siteNote: I will also discuss the quality of the project in your recommendation letterGroup ProjectCE 165Format of the projectCover page: Title of the project, name of the students, a photograph of the group members at the site  Abstract Table of Contents Introduction Core of the report Conclusions AppendixGroup ProjectCE 165Expected coverage: Types of hydraulic cements – Ask why such cement was selected. Types of aggregates– How far is the source of aggregate? Cost?  Air entraining and water-reducing admixtures– Identify the manufacturer of the admixture. – Did they follow the recommended dosage?Group ProjectCE 165Expected Coverage Mineral admixtures– Were environmental considerations included? – Who made the decision of including the mineral admixture? Mix Design– Who was responsible for the design? Formwork– Wood, metal? How many times was it reused?Group ProjectCE 165Expected Coverage Reinforcing steel– Coated rebars were used? – Concerns with corrosion? Ready-mixed concrete, batching and mixing– How far was the producer from the job site? Transport and placement methods– Trucks, conveyor belts, pumped concrete were used?Group ProjectCE 165Expected Coverage Finishing– Any specifications regarding the finishing? Curing– How long was the curing? Early age properties – Any requirement for early age strength?Group ProjectCE 165Expected Coverage Quality assurance; accelerated and non-destructive testing– Has the concrete met the designed strength? How was the quality control? Construction problems– How were they


View Full Document

Berkeley CIVENG 165 - Group project

Download Group project
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Group project and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Group project 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?