Unformatted text preview:

Flooring Improvement Project GBA 573 IT Project Management Problem Statement The problem is the continuous maintenance of a lightly colored carpet installed in multiple high traffic areas in the house along with the decline in carpet appearance Deliverables End Product A durable aesthetically pleasing ceramic tile floor as a replacement to the current carpet covering Project Team Project Manager Installation Supervisor Installation Assistant 1 Installation Assistant 2 Project Scope Remove existing carpeting Install new ceramic tile in the Living Room Dining Room Kitchen Hallway Hallway Bath Project Schedule ROI Analysis 25 year Period Case Best Do it yourself Initial Investment 1 944 Savings Benefits 26 000 ROI 93 Worst 1 944 26 000 89 ROI 25 year period Case Best Hire a Professional Initial Investment 3 900 Savings Benefits 26 000 ROI 85 Worst 6 500 17 333 62 Measures of Success 1 2 Satisfaction with design of ceramic tiles selected The ability of project members to maintain order and cleanliness to the extent the condo is still livable throughout the life of the project 3 The completion of the project within the allotted timeframe 4 The completion of the project within the allotted budget 5 Due to the physical intensiveness of the project success will also hinge on the ability of project team members to complete the project injury free 6 The ability to dispose of waste properly Dumpsters are located on site and are available for project use


View Full Document

USD GBA 573 - Flooring Improvement Project

Course: Gba 573-
Pages: 10
Loading Unlocking...
Login

Join to view Flooring Improvement Project and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Flooring Improvement Project and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?