Unformatted text preview:

Department of Aviation and Technology Dr. Seth P. Bates College of Engineering Spring 2008 Tech 045: Facilities Planning and Development Lecture Schedule [Lect. Schedule last updated January 29, 2008. Subject to change with notice. Check website for current version.] wk Week of: Topic (lecture content) Readings Assignment Class meets Tuesdays 6PM In‐Class meetings are shown in gray shading. Unshaded (white) weeks indicate no class meeting. All assignments due at 6pm unless stated otherwise, by email. 1 1/29/08 Orientation to the class. Overview of course requirements and expectations Readings due by date listed See outside readings list. 2 2/5/08 Introduction and Overview Significance and purposes of Facilities Planning, Role of Corporate Philosophy, Rationale for High‐Performance Green Buildings, Defining Sustainable Construction, Green Building Progress and Obstacles, Emerging Directions Kibert, ch 1 Outside readings Email article 1 for review. Email title and synopsis for Research Paper 3 2/12/08 Background for Sustainability Ethics and Sustainability, Basic Concepts and Vocabulary, Major Environmental and Resource Concerns, The Green Building Movement, Design Tools, Time Analysis Kibert, ch 2 Term Project Proposal draft due. 4 2/19/08 Green Building Assessment LEED Building Assessment Std, LEED Certification Process, Green Globes Building Assessment Protocol, International Building Assessment Systems, Examples of LEED‐NC Buildings, Beyond Today’s Building Rating Systems Kibert, ch 3 Outside readings Email final Research Paper Proposal Article 1 review due. Email article 2 for review. Term Project Proposal ‘Presentations’ Peer Review and Feedback. Attendance mandatory 5 2/26/08 Green Building Process Conventional vs Green Building Delivery Systems, Executing the Green Building Project, The Integrated Design Process, Role of the Charrette in the Design Process, Green Building Documentation Requirements Kibert, ch 4 Submit final Term Project Proposal 6 3/04/08 Ecological Design – Simulation and Modeling Design versus Ecological Design, Historical Perspectives, Contemporary Ecological Design, Future Ecological Design, Emerging View: Shift from Green to Regenerative Design. Simulation tools for internal ops, Process sim. Kibert, ch 5 Article 2 review due. Email article 3 for review. 7 3/11/08 Sustainable Sites and Landscaping Land/Landscape Approaches, Land Use Issues, Permitting, Zoning, Sustainable Landscapes, Enhancing Ecosystems, Stormwater Management, Heat Island Mitigation, Light Trespass and Pollution Reduction Kibert, ch 6 8 3/18/08 Energy and Atmosphere Building Energy Issues, High‐Performance Building Energy Design Strategy, Passive Design Strategy, Building Envelope, Internal Load Reduction, Active Mechanical Systems, Electrical Power Systems, Innovative Energy Optimization Strategies, Smart Buildings and Energy Management Systems, Ozone‐Depleting Chemicals in HVAC&R and Fire Suppression Kibert, ch 7 Draft of Research Paper due if you want feedback. Research Paper Presentations Attendance mandatory. ‐ ‐ 3/25/08 Spring Break – campus closed/no classes Tech 045 Schedule Spring 2008 Page 2 9 04/01/08 Building Hydrologic System Current Building Fixtures and the Energy Policy Act of 1992, High‐Performance Building Hydrologic Cycle Strategy, High‐Performance Building Water Supply Strategy, High‐Performance Building Wastewater Strategy, Landscaping Water Efficiency Kibert, ch 8 Article 3 review due. Email article 4 for review. Research Papers due (final) 10 4/08/08 Closing Materials Loops Issues in Selecting Green Building Materials and Products, Green Building Products vs Green Building Materials, Priorities for Selecting Building Materials and Products, LCA of Building Materials and Products, Key and Emerging Construction Materials and Products, Design for Deconstruc‐tion and Disassembly, Closing Materials Loops in Practice Kibert, ch 9 11 4/15/08 Indoor Environmental Quality Employee and Process Space Requirements, IEQ Issues, Affect on Productivity and Workers, Indoor Environmental Factors, HVAC Systems, Building Materials, Best Practices for IAQ, Managing IEQ During Construction Kibert, ch 10 12 4/22/08 Construction Operations Site Protection Planning, Health and Safety Planning, Construction and Demolition Waste Management, Subcontractor Training, Reducing Footprint of Construction Operations Kibert, ch 11 Article 4 review due. Email article 5 for review. 13 4/29/08 Building Commissioning Essentials of Building Commissioning, Maximizing the Value of Building Commissioning, HVAC System Commissioning, Commissioning of Nonmechanical Systems, Costs and Benefits of Building Commissioning Kibert, ch 12 Term Project report and presentations drafts due if you want feedback. 14 5/6/08 Economic Analysis of Green Buildings General Approach, Business Case for High‐Performance Green Buildings, Economics of Green Building, Quantifying Green Building Benefits, Managing First Costs, Tunneling through the Cost Barrier. Kibert, ch 13 Article 5 review due. 15 5/13/08 Cutting Edge and Beyond Passive Survivability, Case Studies, Articulating Performance Goals for Future Green Buildings, Challenges, Revamping Ecological Design, Sustainable Geometries Term Projects due Report, and Presentation Term Project Presentations Attendance mandatory. 5/20/08 Final exam Tuesday, May 20, 1715‐1930 See study/ planning guide Assignment Description Meaning Email article 1 for review: Send me the title and link for the article to be reviewed Email title and synopsis for Research Paper To be discussed in class 2/5/08 Article 1 review due The first article review is due today Term Project Proposal draft due email a title and description of the project Will be discussed in class Email final Research Paper Proposal This is the proposal that says what you will study Submit final Term Project Proposal you got feedback from both me and your fellow students Draft of Research Paper due if you want feedback Gives you a last chance to get some idea how you are doing before being committed to your Paper Research Papers due (final) Self-explanatory Term Project report and presentations drafts due if you want feedback. Gives you a last chance, etc… Term Projects due Self-explanatory Report, and Presentation You will submit a report on your project AND you will prepare a PowerPoint presentation


View Full Document

SJSU TECH 45 - Schedule

Documents in this Course
Load more
Download Schedule
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Schedule and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Schedule 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?