DOC PREVIEW
MIT 16 810 - Boomerang

This preview shows page 1 out of 3 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 3 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 3 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

Team 3 Laura Condon JoHanna Przybylowski Cross Over Bike: Boomerrang Version 1 A cross over bike is to be designed for the mass consumer market. The expected sales volume is 100,000 per year. Affordability, excellent performance/cost ratio and light weight are most important to be successful in this market. Below is an initial design for manufacturing. The table lists the design requirements and the FEM testing results for a load case of f1 = 50 lbs, f2 = 75 lbs and f3 = 75 lbs. Requirement Required FEM Result: Manufacturing Cost ≤ 5.2$/part $4.05 Performance: d1 ≤ 0.060 mm0.0692 mm d2 ≤ 0.009 mm0.0064 mm First Natural Frequency(Restrained) ≥ 295 Hz 219 Hz First Natural Frequency(Unrestrained) ≥ 505 Hz 544 Hz Mass ≤ 0.27 lb 0.27 lb Figures 1 and 2 below show our initial design and final design for this model. This design concept was prompted by an effort to reduce the cost of manufacturing through the lack of a hole in the material, besides those holes required in the design requirements. The initial sketch for Boomerrang consisted mainly of a center circle from which arms extended and looped around required holes (see Figure 1). The final design (Figure 2) was reached through gradual modification of adding material to areas experiencing high stresses. There was a trade off between mass and performance. We feel that we optimized the design to minimize the displacement while constraining mass; additional modifications made increased the displacements.Figure 1. Initial Solidworks sketch for the Boomerrang model.Figure 2. Final Solidworks sketch for the Boomerrang


View Full Document
Download Boomerang
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Boomerang and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Boomerang 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?