OPM 311: EXAM 2

s and op granularity
product family
Flip
mps granualirty
sku
Flip
system integration
the priciple that well managed erp process linkages exsits between functions and process
Flip
how often does s& op teak place
monthly
Flip
how often MPS reviewd
weekly
Flip
components of s and op review
revenue/profit demand( demand plan) capcity and fufillmen( production plan) inventory( mts only) backlog ( mto or ato only)
Flip
ship plan in MTS is equal to
the demand pland
Flip
the ship plan in MTO is equal to
the prduction plan
Flip
what is the planning horizon for s & op
intermediate, 12 month rolling minimum
Flip
what is the planning horizn for strategic
long range, 3-5 years
Flip
what is the planning horizon for CRP
short range, less than 2 months
Flip
process owner of s & op
president or ceo
Flip
process owner of demand plan
vp sales or markteing
Flip
process owner of production plan
vp of operations
Flip
mainfocus of s & op
manage risk in supply and demand for next 12 rolling months
Flip
do many companies have formal s 7 op process
no
Flip
who build spreadsheets for the s & op
master scheduler
Flip
what is done at pre s & op
prepare for final meeting
Flip
companies have more than one manufacoring sratedgy
mts, ato, mto, eto
Flip
four bsic prodution srategies
chase- match demand level- same amount subcontracting hybrid
Flip
kpi in s & op
ship promise accuracy( customer service) production plan accuracy demand plan accurary target lead time adherence for each product family
Flip
determinign product families includes which areas
common constraints commmon compoents common manufactoring srategy common product line or work cell
Flip
when does pre s & op happen and what is it for
plans scenrios for demand and supply analyze risks prepare for top management questions anticipated in s & op reccomen pland to top managmenet at s & op
Flip
inputs to mps process
beginning inventory production plan forcasted customer orders already sold ( backlog)
Flip
mps delivers 3 thigns to mrp
requirement part number required date required quantity
Flip
indepent demand has to be ____
forecasted
Flip
dependent demand is _____ from indepdent demand
calucauted
Flip
projected on hand balance and and porojected on hand are the same thing
...
Flip
where is the theory of constraints well applied
rccp
Flip
mrp
materials requirements planning
Flip
erp
enterprise resource planning
Flip
inputs into mrp process
mps bom inventory blances
Flip
cumulative lead time
how long is takes to produce product
Flip
customer lead time
from when customer orders to when they receive it
Flip
Product structure and bom are the same thing
...
Flip
pegging
the process of identifying the parent items that have generated a given set of material requirements of ran item
Flip
two basic Mrp systems
regenerative system net change system
Flip
regenerative system
approach that mrp periodoically( one a day or weekly)
Flip
net change system
approach that updates MRP records continuously ( seeral times a day)
Flip
lot sizing rules or "order policy"
lot for lot economic order qauntity fixed period ordering fixed quantity ordering
Flip
lot-for -lot ordering
the order or run size is eqaul to demand minimizes investment in invenoty variable order quantities a new setup required for each run
Flip
economic order quantity
can lead to minimum costs if usage of item is fairly uniform not appropirate for lumpy demand
Flip
fixed period ordering
provides coverage for some predetermined number of period
Flip
fixed quantity
for things like eggs where ther eis alwasy 12 in carton
Flip
erp
integrated system conecting bus planndin with excustion of plans most poplar are oracle and SAP
Flip
key aspects of desinging for sustainability
cradle to grave asseessment end of life programs 3 RS
Flip
cradle to grave asessment
the assessment of the environemtal inpact of a product or service throughout its useful life
Flip
modular design
form of standardization in which components are grouped into modules that are easily replaced or interchanged
Flip
production plan forumla
demand plan +/- delta in inventory divded by number of periods
Flip
mto operations pland formula
demand plan +/- delta in backlog divded by the number of periods
Flip
MPs only covers
independent demand
Flip
master schdue outputs is for
independent demand only
Flip
master schdule deals with
end items and is major input into mrp process
Flip
primary mrp outputs
planned orders firm planned orders order realeases changes
Flip
component commonality benefits
savings is desgin time starndard training for assembly and installation can be bought in bulk from supplier comonality of parts for repair fewer inventory items to be handeld
Flip
decoupling point
point at ehich the process flow stops without a demand signal immediately connected to the process
Flip
setup reduction
system process of reducing machine or process downtime between items or assemblies of different configurion
Flip
setup measuremeant
time form completion of last good peice to the completion of last good peice to ehe ocmpletion of the first good peice in new configuration
Flip
( 1 of 58 )
Upgrade to remove ads
Login

Join to view and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?