Scheduling
Establishing the timing of the use of equipment, facilities and human activities in an organization.
Effective _____ can yield cost savings and increases in productivity.
scheduling
______ decisions must be made within the constraints established by many other decisions.
---
characterized by standardized equipment and activities that provide identical or similar operations.
High Volume Systems
Few ____ ____ are completely devoted to a single product or service, most handle a variety of sizes and models.
Flow Systems
What are the success factors of a flow system?
1) process and product design. 2)rapid repair 3)preventive maintenance 4)optimal product mixes 5)minimize quality problems 6)reliability and timing of supplies.
Typically produce standardized output; but the volume is not large enough to warrant continuous production.
Intermediate volume systems
What are the 3 basic issues of intermediate volume systems?
Run size of jobs, timing of jobs, and sequencing of jobs.
What are the two difficulties companies experience when using intermediate volume systems?
Setup costs and usage rates.
Gantt chart that shows the loading and idle times for a group of machines or list of departments
Load Chart
Gantt chart that shows the orders or jobs in progress and whether they are on schedule.
Schedule Chart
when jobs are assigned to workstations without regard to the capacity of the work center. If the center does not complete production of the load in one period, the incomplete work is basically added to the next period’s load
infinite loading
jobs are assigned to work centers after taking into account the work center capacity and job processing times. The idea is not to go over capacity.
finite loading
scheduling ahead from some point in time.
forward scheduling
scheduling backwards from some due date.
backwards scheduling
simple heuristics used to determine the order in which jobs will be produced.
Priority Rules
What are some examples of priority rules?
first come first serve (FCFS) earliest delivery date (EDD) critical ratio (CR) slack per operation(S/O) shortest processing time (SPT) rush
What are the assumptions of priority rules?
1) The set of jobs is known; no new jobs arrive after processing begins; no jobs are cancelled 2)setup time is independent of processing sequence 3) setup and processing times are deterministic 4)There will be no interruptions in processing
priority rules affect the _____ _____ of a company. These must be selected first and then priority rules are chosen based on them.
performance metrics
What are some examples of performance metrics?
job flow time - the length of time a job is at a workstation job lateness - the difference between job completion time and job due date job tardiness - length of time the job completion time exceeds job due date makespan - total time needed to complete a group of jobs
a technique that managers can use to minimize the makespan for a group of jobs to be processed on two machines or two successive work centers.
Johnson's rule
in order to use Johnson's rule, what conditions must be satisfied?
1) Job time must be known and constant for each job 2) Job times must be independent of job sequence 3)All jobs must follow the same sequence 4)Job priorities cannot be used 5) All units in a job must be completed at the first work center before the job moves to the second

Access the best Study Guides, Lecture Notes and Practice Exams

Login

Join to view and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?