Unformatted text preview:

1 Overview of this Document2 Overview of the Xxxxxx Project3 Sources of Requirements and Capabilities – Documents and Persons4 Capabilities5 Requirements5.1 Functional Requirements5.2 Non-functional Requirements5.3 Constraints6 ReferencesUNC Charlotte Embedded Systems Design Page 1 of 3Project: Xxxxxx Rev. A Requirements DocumentAuthor: Yyyyyy Date: 2007-xx-xxXxxxxx Project – Capabilities and Requirements – Short FormDate Revision Author Comments2006-xx-xx PA1 Yyyyyy Original DocumentTable of Contents1 Overview..................................................................................................................................12 Introduction to the Xxxxxx Project.........................................................................................13 Sources of Requirements – Documents and Persons...............................................................14 Capabilities..............................................................................................................................25 Functional Requirements.........................................................................................................26 Non-functional Requirements..................................................................................................27 Constraints...............................................................................................................................28 References................................................................................................................................21 Overview of this DocumentThis document describes Capabilities and Requirements of the Xxxxxx project and of its end-product. The team member who is identified as the Principal Engineer is responsible to maintainthis document.2 Overview of the Xxxxxx ProjectInclude in here some detail of the project and end-product. This can be lifted from the Statementof Work.3 Sources of Requirements and Capabilities – Documents and PersonsThe following documents were consulted for these capabilities and requirements:- Customer Vvvvvvv- Xxxxxx Statement of Work- Xxxxxx Proposals- Xxxxxx company-supplied requirements- Zzzzzz project Capabilities and Requirements document- Zzzzzz Final Report- Zzzzzz Lessons Learned documentThe following people were consulted for input to the Xxxxxx requirements:- Engineer AUNC Charlotte Embedded Systems Design Page 2 of 3Project: Xxxxxx Rev. A Requirements DocumentAuthor: Yyyyyy Date: 2007-xx-xx- Engineer B- Engineer C4 CapabilitiesThese represent the functionality of the end product, but are not necessarily bounds on what the product should do. These are not requirements, constraints, or specifications. Examples:CAP001: The device should be deployable by two people.CAP002: The device must be transportable to the deployment site by a Rrrrrrr-size boat.CAP003: The device should communicate with the GSTS network using a SkyWave/Inmarsat DMR-200L satellite beacon.CAP004: The device should not use lithium in any form.5 Requirements5.1 Functional RequirementsThese specify specific behaviors of a system. They define the internal workings of the system: that is, the calculations, technical details, sizes, data manipulation and processing, and other specific functionality.REQF0001: The entire device shall weigh less than 80 pounds so that it can be safely deployedby two people. (CAP001)REQF0002: The entire device shall be no larger than 48” by 48” wide so that it can be safely deployed by two people. (CAP001, CAP002)REQF0003: The device shall communicate with a satellite at a minimum speed of 1200 bits-per-second. (CAP003)5.2 Non-functional RequirementsThese specify criteria that can be used to judge the operation of a system, rather than specific behaviors.REQN0001: The battery voltage should support a SkyWave/Inmarsat DMR-200L satellite beacon. (CAP003)5.3 ConstraintsThese limit the development in some way, such as defining an operating system that the project must run on, which programming language must be used to implement the system, what drawingtools must be used, or specific vendors which must be used for manufacture.CONS0001: The device cannot use lithium batteries due to Navy Regulations (CAP004).6 References1. Xxxxxx, Document number xxxxxxxxxxxxxxxxxxxxxxx.UNC Charlotte Embedded Systems Design Page 3 of 3Project: Xxxxxx Rev. A Requirements DocumentAuthor: Yyyyyy Date: 2007-xx-xx2. Web site: www.aaaaaaaa.com3. Papers4.


View Full Document

UNCC ECGR 6185 - Requirements and Capabilities

Documents in this Course
Zigbee

Zigbee

33 pages

Load more
Download Requirements and Capabilities
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Requirements and Capabilities and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Requirements and Capabilities 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?