SC MSCI 314 - MSCI 314 - Lab 1 – Plotting Data

Unformatted text preview:

Holly Dube MSCI 314 1/22/2020 Lab 1 – Plotting Data The slope of this trendline is 4.98 m/s^2The slope of this trendline is 4.7km while h equals 2.17 km/h0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5051015202530f(x) = 4.98x + 0.42R² = 0.96 Velocity V. Time t (seconds)v (m/s)0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5051015202530f(x) = 4.7x + 1.3R² = 0.96Position V. Time t (hours)p(km)The slope for this trendline is 2.4189. The value for h0 is 1.56 and its units are m/s^2. If g = 9.8 m/s^2 then h = 0.02519 m/s. 0 1 2 3 4 5 6 7051015202530354045f(x) = 2.42x + 17.46R² = 0.14Position (m) V. Time (s) t(s)q(m)0 2 4 6 8 10 120.00E+002.00E+004.00E+006.00E+008.00E+001.00E+011.20E+01Speed V. Time Time (hours)Current Speed (km/h)0 2 4 6 8 10 120.00E+002.00E+004.00E+006.00E+008.00E+001.00E+011.20E+01Direction V. Time Time (s)Current Direction (m/s)-4.00E+01-3.00E+01-2.00E+01-1.00E+010.00E+001.00E+012.00E+013.00E+014.00E+01East and North Components of Current Speed V. Time uevnTime (hour) Current Speed km/h-5.00E+01-4.00E+01-3.00E+01-2.00E+01-1.00E+010.00E+001.00E+012.00E+013.00E+014.00E+015.00E+01Along Shore and Cross-Shore Components of Flow Speed V. Time Along shoreCross ShoreTime (h)Current Soeed


View Full Document

SC MSCI 314 - MSCI 314 - Lab 1 – Plotting Data

Documents in this Course
Load more
Download MSCI 314 - Lab 1 – Plotting Data
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view MSCI 314 - Lab 1 – Plotting Data and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view MSCI 314 - Lab 1 – Plotting Data 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?