DOC PREVIEW
PIPELINE CROSSING SPECIFICATIONS

This preview shows page 1 out of 3 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 3 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 3 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

Page 1 of 3 PIPELINE CROSSING SPECIFICATIONS 1. GENERAL REQUIREMENTS Pipe lines under railroad tracks or across or along railroad right-of-way shall conform to current American Railway Engineering Association Specifications. If laws or orders of public authority prescribe a higher degree of protection than specified herein, then the higher degree of protection so specified shall be adhered to. Plans and specifications for proposed installation shall be submitted to the CE (Chief Engineer) and meet the approval of the railroad company before construction is begun. Plans shall be drawn to scale showing the relation of the proposed pipeline, angle of crossing, location of valves, railway survey station, right-of-way line and general layout of tracks and railway facilities. Plan should also show a cross-section (or sections) from field survey, showing pipe in relation to actual profile of ground and tracks, complete description of materials to be used, and location of jacking and receiving pits. If open cutting or tunneling is necessary, details of sheeting and method of supporting tracks or driving tunnel should be shown. The execution of the work on the railway right-of-way, including the supporting of tracks, shall be subject to the inspection and direction of the CE office. Pipelines shall be installed under tracks by boring or jacking, if practicable, Boring excavation must not exceed the outside diameter of the pipe. Jacking or boring of corrugated metal pipe, cast iron pipe or pipe with flanges, bells or couplings will not be permitted. Directional boring will be allowed at the discretion of the Railroad. Soils investigation and a geotechnical report may be required. Pipeline shall be located, where practicable, to cross tracks at approximately right angles thereto but preferably at not less than 45 degrees. Pipelines shall not be placed within a culvert, under railway bridges, nor closer than 100 feet to any portion of any railway bridge, building or other important structure, except in special cases and than be of special design as approved by the CE of the railway company. Pipelines laid longitudinally in railway right-of-way shall be located as far as practicable from any tracks or other important structures. Pipelines carrying flammable products or products under pressure located within 25 feet of the centerline of any track or where there is danger of damage from leakage to any bridge, building or other important structure, shall be encased or of special design as approved by the CE of the railway company. Pipelines laid longitudinally on the railway right-of-way, 50 feet or less from the centerline of track shall be buried not less than 4’6” from the ground surface to the top of pipe. If distance is more than 50 feet from centerline of track, minimum cover shall be 3 feet. If additional tracks are constructed in the future and the Railway company determines that the roadbed requires widening, then the casing shall be extended correspondingly by the Licensee at the Licensee's cost. All casing pipes, except those laid longitudinally, shall be sloped not less that 0.3%. Pipelines shall not be installed on wood trestles but consideration will be given to permitting attachment to steel spans where unreasonable expense would be required to provide separate crossing over waterway, public way or railroad as approved by the CE. The ends of casing pipe shall be securely and permanently sealed to outside of carrier pipe with approved joint material against encroachment of outside elements. The vent pipes shall be connected to the top surface of casing pipe at both ends of the casing pipe.Page 2 of 3 PIPELINE CROSSING SPECIFICATIONS 1. PIPELINES CARRYING FLAMMABLE SUBSTANCES This includes oil, gas, gasoline, petroleum products or other flammable or highly volatile substance under pressure. At all other locations on the right-of-way the minimum ground cover for uncased steel natural gas pipes must be six (6) feet. 2. PIPELINES CARRYING NON-FLAMMABLE SUBSTANCES This includes steam, water or any non-flammable substance, which from its nature or pressure might cause damage if escaping on or in the vicinity or railway property. Sewers and drains do not require casing pipe unless conditions exist which will endanger security of track, but must be of sufficient strength to withstand E-80 railway loading.Page 3 of 3 PIPELINE CROSSING SPECIFICATIONS Additional Resources for Underground Crossings http://www.undergroundfocus.com/onecalldir.php Provides links and information on state calls for cable locates http://www.ntdpc.com/ National Telecommunications Damage Prevention Council http://www.commongroundalliance.com Common Ground


View Full Document

PIPELINE CROSSING SPECIFICATIONS

Download PIPELINE CROSSING SPECIFICATIONS
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view PIPELINE CROSSING SPECIFICATIONS and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view PIPELINE CROSSING SPECIFICATIONS 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?