DOC PREVIEW
GT MGT 3501 - Lean Operations

This preview shows page 1-2-24-25 out of 25 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 25 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 25 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 25 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 25 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 25 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

Lean OperationsA Little History!Slide 3Slide 4Slide 5Slide 6Waste: ClassificationTPS: Toyota Production SystemReducing Waste: Quality at SourcePoka-YokeSlide 11JidokaPowerPoint PresentationSlide 14Reducing Waste: Increase Problem VisibilityReducing Waste: Push versus Pull SystemReducing Waste: From Functional Layout…...to Cell LayoutReducing Waste: Cut Batch SizesSynchronize: Heijunka Mixed, Level/Balanced ProductionContinuous Improvement: KaizenSlide 22Management By Stress: Does “S” in TPS Stand for Stress (1)?Management By Stress: Does “S” in TPS Stand for Stress (2)?If You’re Curious to know more..Lean Operations“Eliminate WasteThrough Continuous Improvement”A Little History!Benjamin FranklinPoor Richard’s Almanac: He that idly loses 5s. [shillings] worth of time, loses 5s., and might as prudently throw 5s. into the river. He that loses 5s. not only loses that sum, but all the other advantages that might be made by turning it in dealing, which, by the time a young man becomes old, amounts to a comfortable bag of money."A Little History!GilbrethSaw that masons bent over to pick up bricks from the ground. The bricklayer was therefore lowering and raising his entire upper body to get a 5 pound (2.3 kg) brick but this inefficiency had been built into the job through long practice. Introduction of a non-stooping scaffold, which delivered the bricks at waist level, allowed masons to work about three times as quickly, and with less effort.A Little History!Ford: Eliminate Waste"I believe that the average farmer puts to a really useful purpose only about 5 %. of the energy he expends. … Not only is everything done by hand, but seldom is a thought given to a logical arrangement. A farmer doing his chores will walk up and down a rickety ladder a dozen times. He will carry water for years instead of putting in a few lengths of pipe. His whole idea, when there is extra work to do, is to hire extra men. He thinks of putting money into improvements as an expense. … It is waste motion— waste effort— that makes farm prices high and profits low."A Little History!Ford: Design for manufacturingStart with an article that suits and then study to find some way of eliminating the entirely useless parts. This applies to everything— a shoe, a dress, a house, a piece of machinery, a railroad, a steamship, an airplane. As we cut out useless parts and simplify necessary ones, we also cut down the cost of making. ...But also it is to be remembered that all the parts are designed so that they can be most easily made."A Little History!Ohno – put ideas into practice systematically“When bombarded with questions from our group on what inspired his thinking, Ohno just laughed and said he learned it all from Henry Ford's book."Waste: ClassificationWaste from overproduction Inventory wasteWaste from waiting timeTransportation wasteProcessing wasteWaste of motionWaste from product defectsA system that continually searches for and eliminates waste throughout the value chain. Views every enterprise activity as an operation and applies its waste reduction concepts to each activity - from Customers to the Board of Directors to Support Staff to Production Plants to Suppliers.TPS: Toyota Production SystemReducing Waste: Quality at SourceFailsafe design (Poka-Yoke)Stopping work immediately when problem occurs (Jidoka)Line-stopping empowerment (Andon)TPS: Toyota Production SystemPoka-YokePoka-YokePoka-yoke page: http://csob.berry.edu/faculty/jgrout/pokayoke.shtmlJidokaAndonDefects found at:Current ProcessNext ProcessEnd of LineFinal InspectionEnd UserImpact to the Company:· VeryMinor· MinorDelay· Rework· Reschedulingof work· SignificantRework· Delay inDelivery· AdditionalInspection· WarrantyCosts· AdministrativeCosts· Reputation· Loss ofMarket ShareReducing Waste: Quality at SourceReducing Waste: Increase Problem VisibilityMissed Due DatesScrap & ReworkMachine DowntimeSupply FluctuationsExcessive Paperwork InventoryMaterial FlowInformation FlowFGICustomerRawMaterialSupplierFinalAssemblyPUSH FGICustomerRawMaterialSupplierFinalAssemblyPULL TPS System uses KanbansReducing Waste: Push versus Pull SystemProductionControlProductionControlProductionControlRoofCutRoofCutRoofCutBaseCutBaseCutBaseCutFABaseAssyFA FABaseAssyBaseAssyQCQC QCReducing Waste: From Functional Layout…ProductionControlFABaseCutRoofCutBaseAssyProductionControlFABaseCutRoofCutBaseAssyProductionControlFABaseCutRoofCutBaseAssy...to Cell LayoutBatch Mfg. (Lot Size = 4) Flow Mfg. (Lot Size = 1)01234816TimeExample Process: A B C D1 min/job 1 min/job 1 min/job 1 min/job A B C D4444 A B C DTime111101234816Reducing Waste: Cut Batch SizesBatch Production Schedule Mixed Production Schedule (AAAABBBB...) (ABAB...) Apr/12.........15..................30 Apr/12..........15...................30Products A BtimeFGItimeFGISynchronize: HeijunkaMixed, Level/Balanced ProductionIncrease visibility of wasteStandardize workTargeted improvementsActive worker involvementSupplier involvementTime for experimentationExploratory stressContinuous Improvement: KaizenA system that continually searches for and eliminates waste throughout the value chain.Poka-Yok eJidokaAndonKanbanHeijunkaKaizenTPS: Toyota Production SystemManagement By Stress: Does “S” in TPS Stand for Stress (1)?“Empower employees”  Employees responsible for errors.“Drive out waste”  No slack in the human system.“Kaizen”  Improvements discovered by workers are co-opted by management.“Workers design their jobs”  Workers do industrial engineering jobs without the pay.“Reduce indirect labor”  Make workers do management’s job.“Reduced buffers”  More stress and less room for error or fatigue.“Respect for workers”  As long as workers define their personal goals as satisfying management’s agenda…“Productivity enhancements are dramatic”  Workers work real hard, with little spare time.Management By Stress: Does “S” in TPS Stand for Stress (2)?If You’re Curious to know more..Lean Blog: http://kanban.blogspot.com/Books:Ohno, Taiichi (1988), Toyota Production System: Beyond Large-Scale Production, Productivity Press.Womack, James P., Jones, Daniel T., and Roos, Daniel (1991), The Machine That Changed the World: The Story of Lean Production,


View Full Document

GT MGT 3501 - Lean Operations

Download Lean Operations
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Lean Operations and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Lean Operations 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?