Laboratory SetupRack Setup - Work AreaXYPLEX ServerHubSwitch Cisco 2900Patch PanelLogical ConnectionsLogical ConnectionsStation AddressingLaboratory Setup4/6/2009Rack Setup - Work AreaPatch PanelAsante HubLANPlexUPSCisco SwitchCisco Switch2900Cisco Switch4000/7000Cisco Switch4000/7000XYPLEX Server Located at the end of the room; interfaced to a PC One for each sideHub Make sure the lights led up when you plug-in a cable 12 10BaseT portsSwitch Cisco 2900 Make sure the lights led up when you plug- in a cable 24 10BaseT/100BaseT ports on each switchPatch PanelConnected to CISCO 2900Logical ConnectionsLogical ConnectionsStation Addressing 6 work areas (racks) 4 stations per rack Addressing: 192.168.0.xx For work area 1: 1a= 1x16+10=26 1b= 1x16+11=27 1c= 1x16+12=28 1d= 1x16+13=29Front of the
View Full Document