Unformatted text preview:

Resource PlanningERP—Enterprise Resource PlanningLecture OutlineSlide 4Material Requirements Planning (MRP)Demand CharacteristicsMaterial Requirements PlanningMRP Inputs and OutputsMaster Production ScheduleSlide 10Product StructureProduct Structure TreeMultilevel Indented BOMSpecialized BOMsSpecialized BOMs (cont.)Modular BOMsTime-phased BillsSlide 18Slide 19Slide 20Slide 21MRP: ExampleMRP: Example (cont.)Slide 24Basic MRP formulasMore formulasOn-hand inventorySlide 28Slide 29Slide 30Slide 31Slide 32Slide 33Slide 34Slide 35Slide 36Slide 37Lot Sizing in MRP SystemsUsing Excel for MRP CalculationsAdvanced Lot Sizing Rules: L4LAdvanced Lot Sizing Rules: EOQAdvanced Lot Sizing Rules: POQPlanned Order ReportMRP Action ReportCapacity Requirements Planning (CRP)CRPCalculating CapacityCalculating Capacity (cont.)Slide 49Reducing Over-load ConditionsSlide 51Slide 52Determining Loads and CapacitiesSlide 54Relaxing MRP AssumptionsEnterprise Resource Planning (ERP)ERP and MRPEvolution of ERP IIA lesson in Information ArchitectureGoldratt Methodology (Thinking Process)WHAT TO CHANGE CIRCA 1993: Problems with the Mainframe ArchitectureMore problemsComponents of any Software ApplicationComponents in briefMainframe ArchitectureGoldratt: We will build a treeSlide 67Slide 68WHAT TO CHANGE TO:HOW TO CAUSE THE CHANGE:Organizational Data FlowsERP’s Central DatabaseSelected Enterprise Software VendorsERP ImplementationCustomer Relationship Management (CRM)Supply Chain ManagementProduct Lifecycle Management (PLM)ERP and Software SystemsConnectivitySlide 80Copyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.Beni AsllaniBeni AsllaniUniversity of Tennessee at ChattanoogaUniversity of Tennessee at ChattanoogaResource PlanningResource PlanningOperations Management - 6th EditionOperations Management - 6th EditionChapter 15Chapter 15Roberta Russell & Bernard W. Taylor, IIIRoberta Russell & Bernard W. Taylor, IIICopyright 2006 John Wiley & Sons, Inc.Copyright 2006 John Wiley & Sons, Inc.14-14-22ERP—Enterprise Resource ERP—Enterprise Resource PlanningPlanningStarts with slide 56Starts with slide 56We will not be covering the material on We will not be covering the material on pages 647-667 of Chapter 15 until after pages 647-667 of Chapter 15 until after the second exam the second examCopyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-33Lecture OutlineLecture OutlineMaterial Requirements Planning (MRP)Capacity Requirements Planning (CRP)Enterprise Resource Planning (ERP)Customer Relationship Management (CRM)Supply Chain Management (SCM)Product Lifecycle Management (PLM)Copyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-44Resource Planning for ManufacturingCopyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-55Material RequirementsPlanning (MRP)Computerized inventory control and production planning systemWhen to use MRP?Dependent demand itemsDiscrete demand itemsComplex productsJob shop productionAssemble-to-order environmentsCopyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-66Demand CharacteristicsDemand Characteristics1122334455WeekWeek400 400 –300 300 –200 200 –100 100 –No. of tablesNo. of tablesContinuous demandContinuous demandM T W Th F M T W Th FM T W Th F M T W Th F400 400 –300 300 –200 200 –100 100 –No. of tablesNo. of tablesDiscrete demandDiscrete demandIndependent demandIndependent demand100 tables100 tablesDependent demandDependent demand100 x 1 = 100 x 1 = 100 tabletops100 tabletops100 x 4 = 400 table legs100 x 4 = 400 table legsCopyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-77Material Material Requirements Requirements PlanningPlanningMaterialrequirementsplanningPlanned order releasesWork ordersPurchase ordersRescheduling noticesItemmaster fileProductstructure fileMaster production scheduleCopyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-88MRP Inputs and OutputsMRP Inputs and OutputsInputsInputsMaster production Master production schedulescheduleProduct structure fileProduct structure fileItem master fileItem master fileOutputsOutputsPlanned order Planned order releasesreleasesWork ordersWork ordersPurchase ordersPurchase ordersRescheduling noticesRescheduling noticesCopyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-99Master Production ScheduleMaster Production ScheduleDrives MRP process with a schedule of Drives MRP process with a schedule of finished productsfinished productsQuantities represent production not demandQuantities represent production not demandQuantities may consist of a combination of Quantities may consist of a combination of customer orders and demand forecastscustomer orders and demand forecastsQuantities represent what needs to be Quantities represent what needs to be produced, not what can be producedproduced, not what can be producedQuantities represent end items that may or Quantities represent end items that may or may not be finished productsmay not be finished productsCopyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-1010Master Production Schedule Master Production Schedule (cont.)(cont.)PERIODPERIODMPS ITEMMPS ITEM1122334455Pencil CasePencil Case125125125125125125125125125125ClipboardClipboard85859595120120100100100100LapboardLapboard7575120120474720201717LapdeskLapdesk00505000505000Copyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-1111Product StructureTop clip (1) Bottom clip (1)Pivot (1) Spring (1)Rivets (2)Finished clipboard Pressboard (1)ClipboardCopyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-1212Product Structure TreeProduct Structure TreeClipboardLevel 0Level 0Level 1Level 1Level 2Level 2Spring (1)Bottom Clip (1)Top Clip (1)Pivot (1)Rivets (2)Clip Ass’y (1)Pressboard (1)Copyright 2009 John Wiley & Sons, Inc.Copyright 2009 John Wiley & Sons, Inc.15-15-1313Multilevel Indented BOMMultilevel Indented BOM0 - - - -0 - - - -ClipboardClipboardeaea11- 1 - - -- 1 - - -Clip AssemblyClip Assemblyeaea11- - 2 - -- - 2 - -Top ClipTop Clipeaea11- - 2 - -- - 2 - -Bottom ClipBottom Clipeaea11- - 2 - -- - 2 - -PivotPivoteaea11- - 2 - -- - 2 - -SpringSpringeaea11- 1 - - -- 1 - -


View Full Document

TTU ISQS 5343 - Resource Planning

Download Resource Planning
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Resource Planning and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Resource Planning 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?