DOC PREVIEW
NU OPNS 430 - Chapter 4 Flow time Analysis

This preview shows page 1-2 out of 7 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 7 pages.
Access to all documents
Download any document
Ad free experience
View full document
Premium Document
Do you want full access? Go Premium and unlock all 7 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 7 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

Chapter 4: Flow Time Analysis4.3 Solutions to the Problem SetProblem 4.1[a] Draw a process flow diagram.[b]. The theoretical flow time is 36 minutes:[c]. The flow time efficiency is 36/60 = 60%Problem 4.2Problem 4.3Problem 4.4Table TM-4.2: Work Content computation for Problem 4.24.5[a] A process map[b] The theoretical flow time is 50 minutes. The critical path is the one of F1 (process and separate, Activity A, Activity B, Loan Officer).[c] The flow time efficiency is 50/7*480 = 50/ 3360= 1.49%4.6[a]. The theoretical flow time of the process is 17 seconds:For passenger without additional check (80% of passangers), the theoretical flow time is (1.5/18)*60 = 5 seconds[b] The flow time efficiency is 17/ 135 = 12.5%4.7[a] The theoretical flow time can be obtained by averaging the activitity time of the two activities, “time with judge” and “pay fine”. These amount to 1.55minutes and 2.4 minutes respectively. Thus the theoretical flow time is 1.55 + 2.4 = 3.95 minutes.[b] The average flow time of the process can be estimated by taking average of the total time spent is system. This come out to 120 minutes.[c] The flow time efficiency is 3.95/120 = 3.3%Chapter 4 25CHAPTER 4: FLOW TIME ANALYSIS4.3 Solutions to the Problem SetProblem 4.1[a] Draw a process flow diagram.[b]. The theoretical flow time is 36 minutes: There are three paths through the system:A: Take Order – Food – Deliver – Bill → 4 + 18 + 12 + 2 = 36 minsB: Take Order – Wine – Deliver – Bill → 4 + 4.8 + 12 + 2 = 22.8 minsC: Take Order – Cart – Deliver – Bill → 4 + 10 + 12 + 2 = 28 minsPath A is critical so the TFT is 36 minutes[c]. The flow time efficiency is 36/60 = 60%Problem 4.2 80%Take OrderManager4 MinutesDeliver OrderWaiter12 MinutesBill GuestWaiter 2 MinutesPrepare FoodKitchen18 MinutesPrepare WineSommelier Average Time= 0.8 × 6 = 4.8MinutesPrepare CartWaiter10 Minutes26 Chapter 4[a] The flow chart of the process is as shown in Figure TM-4.1.Figure TM-4.1. Flow chart of the Kristen Cookies Process flowFlow unit = 1 order of 1 dozen the theoretical flow time is 26 minutes. This is determined by adding the activity times from start to finish for 1 dozen cookies.[b] Flow unit = 1 order of 2 dozen. To determine the theoretical flow time for this flow unit, we first observe that certain activities can be performed in parallel. For example, while the oven is baking the first dozen, You can spoon the dough for the second dozen into another tray. Therefore, the flow time of such an order is not simply the sum of the activity times. A useful tool is a Gantt chart that shows the times during which different resources of interest are occupied for various activities. A Gantt chartfor the three resources executing an order of 2 dozen cookies is shown in Figure TM-4.2. The dough for the 2 dozen cookies is mixed by You in 6 minutes and subsequently you spoon dough for 1 dozen in 2 minutes. Therefore in the 8th minute, the RM is ready to load the oven and set timer, which takes 1 minute. The oven starts baking the first dozen at the 9th minute and completes baking at the 18th minute. Meanwhile, You spoon the second dozen into another tray. At the 18th minute, the RM unloads the first tray from the oven and loads the second tray into the oven and sets the timer. So the second dozen starts baking at the 19th minute. While the second dozen bakes, the first dozen cookies cool and RM packs them into a bag, which takes a total of 7 minutes. At the 28th minute the second dozen finishes baking at which time the RM unloads the tray. After cooling for 5 minutes, the RM packs the second dozen in 2 minutes by the 35th minute. Finally, payment for the order and delivery tocustomer takes place in the 36th minute. Therefore the theoretical flow time for an order of 2 dozen cookies is 36 minutes.An alternate way to compute the theoretical flow time is using the concept of bottleneck resources (discussed in Chapter 5). Oven is the bottleneck resource with 10 minutes of activity per dozen cookies. Observe that the first dozen goes into the oven at the end of 8 minutes. The second dozen will go into the oven 10 minutes after the first dozen. Therefore, the theoretical flow time of the second dozen = theoretical flow time of the first dozen + activity time at the bottleneck = 26 + 10 = 36 minutes. Similarly, theoretical flow time of 3 dozen = theoretical flow time of the first dozen + 2 * activity time at the bottleneck = 26 + 2*10 = 46 minutes.TakeOrderWash & MixSpoonLoad & Set Timer BakeUnloadCoolPackAcceptPaymentOrderReady You6min / 1-3dozYou2min / doz.Roommate, Oven1 min / doz.Oven9 min/doz.Roommate---5 minRoommate2 min /dozRoommate1 min / orderChapter 4 27Figure TM-4.2: Gantt Chart for Kristen’s Cookie; order size = 2 dozen.1. With two ovens, the baking of the two dozen can be overlapped. So You can spoon the second dozen into another tray by the 10th minute. At this time, the RM is ready to load the second oven. The second oven will finish baking the second dozen by the 20th minute. The first dozen is out of the oven at the 18th minute after which it cools for 5 minutes and then the RM packs them in 2 minutes finishing at 25th minute. By this time, the second dozen has cooled and ready to be packed which takes another 2 minutes. Payment and delivery takes another 1 minute finishing theorder in 28 minutes. 2. With one big oven, both trays get loaded into the oven at the end of the10th minute. The timer is set only once; the baking starts at the 11th minute and finishes at minute 20. The two trays cool simultaneously by minute 25. Packing takes a total of 4 minutes and payment and delivery of order another 1 minute completing the process in 30 minutes.3. With one faster convection oven, we can repeat the procedure as for a single oven (using the Gantt chart). The first dozen starts baking in the convection oven at the 9th minute and finishes baking at the 15th minute. Meanwhile the second dozen is ready to go into the oven. The RM sets the timer in 1 minute and the baking process for the second dozen starts at the 16th minute and ends at the 22nd minute. Meanwhile, there is just enough time for the first dozen to cool and be packed. At the end of 22nd minute, the RM unloads the second dozen, lets it cool for 5 minutes and packs them taking 2 more minutes. The order is ready by 29th minute at which time it is delivered and payment is accepted, giving a total theoretical flow time of 30 minutes.Problem


View Full Document
Download Chapter 4 Flow time Analysis
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Chapter 4 Flow time Analysis and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Chapter 4 Flow time Analysis 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?