California State Polytechnic University, PomonaDepartment of Civil EngineeringCE 222/222L Highway EngineeringSpring, 2008General Info CE222-01 CE222-02 CE222L-03Mon.-Wed. Mon. – Wed. Tues./Thurs.CRN: 31344 CRN: 31345 CRN: 3134711:00 – 11:50 AM 12:00 – 12:50 PM 1:00 – 3:50 PM17-2646 17-2646 17-2646Instructor Dr. Xudong Jia, P.E.Civil Engineering Building 17-2673Phone: 909-869-4312 Fax: 909-869-4342Email: [email protected] Hours:Monday 1:00 PM – 3:00 PMTuesday 4:00 PM – 5:00 PMWednesday 1:00 PM – 3:00 PMObjectives Students should be able to conduct geometric design of highways,highway sub-structure design, roadway structural section, flexiblepavement design and rigid pavement design using the designprocedures defined in AASHTO and Caltrans books, as well asInRoads design package.Students should have a basic understanding of highway surfacetreatment and rehabilitation and procedures with regards to theconstruction contracts and supervision.Textbooks 1. Highway Engineering, 7th Edition, Paul W. Wright, 20042. Caltrans Design Manual, Selected Pages, 2001 or downloadfrom http://www.dot.ca.gov/hq/oppd/hdm/hdmtoc.htm3. CE222 Lab Book, 2007Grading Policy Lecture LabAssignments 25% Lab Assignments 25%Midterm 35% Design Project 60%Final Exam 35% Project Report 20%Participation 5% Participation 5%Lecture and Lab Outline________________________________________________________________________Week Lecture Reading Lab Reading1. 4/1-4/4 Introduction Ch. 1,2,3 CAiCE Tutorial Prj. TeamingHighway Admin.Trans. Planning2. 4/7 – 4/11 Driver/Veh./Traffic Ch 5,6 CAiCE Tutorial3. 4/14 – 4/18 Highway Design Ch. 7,8 CAiCE Tutorial Part A Due Horizontal Align.Vertical Align.4. 4/21 – 4/25 Highway Design Ch. 9 Project Description Prj. SpecIntersections & DesigInterchanges Designation5. 4/28 – 5/2 Midterm Ch. 13, 17 Project Discussion Caltrans HDMEarthwork H. Align.Profile6. 5/5 – 5/9 Drainage & Ch. 12, 15 Project Discussion Caltrans HDMHighway materials Ch. 18 Vert. Align.Cross Sections 7. 5/12 – 5/16 Pavement Design Ch. 16 Project Discussion Caltrans HDMFlexible Pavement Earthwork8. 5/19 – 5/23 Pavement Design Ch. 20 Project Discussion Caltrans HDMConcrete Pavement AC/PCC Pavement Design9. 5/26 – 5/30 Contracts & Ch. 14 Project Discussion Final ReportSupervision Quantity and Cost SpecificationEstimates Caltrans HDM10. 6/1 – 6/6 Highway Maintain. Ch. 21 Report Writing Final Report and Rehabilitation Part B Due11. 6/9 – 6/13 Final
View Full Document