DOC PREVIEW
EIU BUS 3500 - Exam3ReviewExercise1(F10)

This preview shows page 1 out of 2 pages.

Save
View full document
View full document
Premium Document
Do you want full access? Go Premium and unlock all 2 pages.
Access to all documents
Download any document
Ad free experience
Premium Document
Do you want full access? Go Premium and unlock all 2 pages.
Access to all documents
Download any document
Ad free experience

Unformatted text preview:

BUS 3500 Management Information SystemsExam 3 Review Exercise1) Which of the following is true about SDM? (Choose all that apply)a) They provide guidelines for developing IS and maintaining them which includes upgrading andimproving them.b) SDM are needed when a brand new IS has to be developed, but you don’t need to use a SDM when it comes to modifying an existing IS.c) When a company is engaged in developing an IS, the process involves the company’s employees who would be the future users of the IS, and IS professionals like system analysts and programmers. But it doesn’t involve the company’s management2) Which of the following IS professionals is usually involved in the Development phase of the SDLC (Choose all that apply)a) Project managerb) System analystc) Network engineerd) Programmere) Web designer3) Which of the following professionals is usually involved in the Planning phase of the SDLCa) Project managerb) System analystc) Network engineerd) Programmere) Web designer4) Which of the following is true about SDLC? a) It’s a very flexible methodologyb) Multiple teams could work simultaneously on different phasesc) It could be the best methodology for situations where the needs and requirements are likely to change during the development processd) None of the above5) Technical feasibility analysis attempts to determine whether the kind of technologies required to develop the system exist. T F6) Software programs like Microsoft Project could be used during the Planning phase of the SDLC methodology. T F7) Pseudo-codes are among the tools used during the Development phase of the SDLC methodology T F8) DFD are used during the Development phase of the SDLC methodology T F9) Interviews and observing users at work are among the techniques used during the Planning phase of the SDLC methodology T F10) Code generators are among the tools used during the Development phase of the SDLC methodology T F1/211) In this type of system testing, the system is run in a simulated environment with simulated data: A) Stub testingB) Verification testingC) Unit testingD) Validation testing12) In this type of system implementation, a company installs a new system at only one location or in one department: A) Direct cutoverB) Pilot testing C) Staged conversionD) Parallel conversion13) What systems development methodology involves rapid development and testing of a working model ofa system and iterative modification of the model until user requirements are met? A) CASEB) RADC) PrototypingD) User interface design14) In this type of SDM, the development team needs to identify each item or entity, its properties, and the procedures associated with that item or entity: A) Joint application developmentB) Rapid application and developmentC) Object-oriented analysis and designD)


View Full Document

EIU BUS 3500 - Exam3ReviewExercise1(F10)

Documents in this Course
Load more
Download Exam3ReviewExercise1(F10)
Our administrator received your request to download this document. We will send you the file to your email shortly.
Loading Unlocking...
Login

Join to view Exam3ReviewExercise1(F10) and access 3M+ class-specific study document.

or
We will never post anything without your permission.
Don't have an account?
Sign Up

Join to view Exam3ReviewExercise1(F10) 2 2 and access 3M+ class-specific study document.

or

By creating an account you agree to our Privacy Policy and Terms Of Use

Already a member?